Premium Court
Stage 1
Desktop Assessment & Site Visit
PadelHOME are able to offer a free of charge desktop site assessment to understand to make an initial proposal on the best type of court for your location and level of planning application that will need to be made.
Stage 2
Planning
padelHOME have an expert in house planning department that will handle your planning application from start to finish with the relevant authority. An initial site visit will determine the desired and best location taking into consideration factors such as noise and light pollution.
Should you wish to handle the planning process yourself we can provide the necessary plans and technical specifications for your application.
Stage 3
Site visit & Surveys
Once planning has been approved, PadelHOME will conduct a fully site survey. A topographical and geotechinical survey of the site area would be carried out to understand the site conditions. This will then be handed over to our ground works team.
Stage 4
Client Approval
Once planning and budget have been approved, we will provide a project pack specifying court design, budget parameters and estimated timelines for client approval so that we can proceed with the installation of the court(s).
Stage 5
Ground works
Our expert construction team would then carry out any ground works required, from new site preparation to building on existing court structures, to prepare the site for court installation. This will include any electrical and drainage fixes necessary for outdoor site installation as well as a concrete ring beam to which the glass panel posts will be affixed.
Stage 6
Manufacture
Precision and quality of materials are paramount at every stage of the build if your court. We take into account vital aspects such as the thickness of the steel panels, the quality of glass through, to the optimal lighting design.
Stage 7
Turf & Padel court installation
An experienced team of padel court operatives will build your court in 4-5 days. From the artificial turf to the integral structure of the court, each part is installed with care and precision to ensure a padel court that is built to last with minimum maintenance costs.
Stage 8
Sign off & after sales
Once installation has been completed, we will carry out a final QC and installation sign off. A comprehensive after sales pack will be provided detailing how to maintain your court and the maintenance care packages available should you require them. Once the installation team have signed off your project your warranty will be activated and you are free to play padel!
Once the installation team have signed off your project your warranty will be activated and you are free to play padel!
After Sales Care
PadelHOME will provide a maintenance pack for your court(s) to ensure you get the optimum experience from your court and to ensure the longevity of your court.
We also provide a maintenance service that can be put in place on an annual basis to check turf and court structure if required. Please ask a member of our team should you require further information about this.